availability:week:installguide

This is an old revision of the document!


Installation Guide

Availability condition per week from course start

Installing the plugin

this plugin installs in the start way:

  • Unzip the plugin archive in the /availability/condition directory of your moodle installation.
  • Browse to the Administration > Notifications to terminate the install.

Global Settings

the administrator can choose just one option in the plugin global settings:

Reference date

The reference date for calculating the cutoff date can be choosen as being:

  • The course start date. In that case the cutoff date for the controlled item is absolute and identical for all students.
  • The date of the user's enrolment. In that case the cutoff date will be relative for each student individually and equally.

Retour à l'index du composant

availability/week/installguide.1488110271.txt.gz · Last modified: 2024/04/04 15:50 (external edit)