availability:week:installguide
Table des matières
Installation Guide
Availability condition per week from course start
Installing the plugin
this plugin installs in the start way:
- Unzip the plugin archive in the /availability/condition directory of your moodle installation.
- Browse to the Administration > Notifications to terminate the install.
Global Settings
the administrator can choose just one option in the plugin global settings:
Reference date
The reference date for calculating the cutoff date can be choosen as being:
- The course start date. In that case the cutoff date for the controlled item is absolute and identical for all students.
- The date of the user's enrolment. In that case the cutoff date will be relative for each student individually and equally.
availability/week/installguide.txt · Dernière modification : de 127.0.0.1
